Alto-Shaam ASF-75G Spezifikationen

Stöbern Sie online oder laden Sie Spezifikationen nach Friteusen Alto-Shaam ASF-75G herunter. Alto-Shaam ASF-75G Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 49
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
W164 N9221 Water Street P.O. Box 450 Menomonee Falls, Wisconsin 53052-0450 USA
PHONE: 262.251.3800• 800.558.8744
USA/CANADA
 FAX:262.251.7067•800.329.8744
U.S.A. ONLY
www.alto-shaam.com
M N - 2 8 6 4 1 0 9 / 1 0
p r i n t e d i n u . s . a .
GAS FRYER
FryTech Series
ASF-60G and
ASF-75G
Gas Fryers
with
Basic Control
•INSTALLATION
•OPERATION
•MAINTENANCE
ASF-60G shown with
optional automatic
basket lifts
ASF-75G shown with
optional automatic
basket lifts
Seitenansicht 0
1 2 3 4 5 6 ... 48 49

Inhaltsverzeichnis

Seite 1 - Basic Control

W164 N9221 Water Street • P.O. Box 450 • Menomonee Falls, Wisconsin 53052-0450 USA PHONE: 262.251.3800• 800.558.8744USA/CANADA FAX:262.251

Seite 2

Declared input (kW) 35.15Gas Group I2H(20),I2E(20),I2E+(20/25),I2L(25),I3+(28-30/37),I3B/P(30),I3B/P(37),I3B/P(50),I3P(37),I3P(50)Inlet press

Seite 3

Use an approved gas pipe sealant at allexternalthreadedconnections, gas piping used on gas connections must avoid sharp bends that may restrict th

Seite 4 - INSTALLATION

The fryer must be supplied with a connector that complies with all state and local installation codes.Any appliance that is not furnished with a power

Seite 5

An electrical wiring diagram is located in the front access door of the fryer. The fryer must be installed by a qualified electrician. This applianc

Seite 6

Gas Fryer Operation & Care Manual • 12OPERATIONOIL/SHORTENING REQUIREMENTSTheASF-75Grequires73-pounds(33kg)ofoilorshortening in th

Seite 7

Gas Fryer Operation & Care Manual • 13OPERATIONGas Fryer Operation & Care Manual • 13OPERATIONigntionalarmmasterpowerswitchcontr

Seite 8

NOTE: Perform an initial boil-out to clean and sanitize the fryer before operating.Carbonized deposits along with an accumulation of oil will eventu

Seite 9

Gas Fryer Operation & Care Manual • 15OPERATION7. Add boil out solution. Carefully follow the manufacturer’sdirectionsformixingtheboi

Seite 10 - DANGER

Gas Fryer Operation & Care Manual • 16OPERATIONNOTE: Perform an initial Boil-Out to clean and sanitize the fryer station before operating

Seite 11

Gas Fryer Operation & Care Manual • 17OPERATIONTHOROUGHLY CLEAN DAILY The cleanliness and appearance of this unit will contribute consid

Seite 12 - WARNING

Gas Fryer Operation & Care Manual • 2Delivery 1Unpacking 1Safety Procedures and Precautions 2InstallationInstallation Requirements 5-11Di

Seite 13

Gas Fryer Operation & Care Manual • 18OPERATIONCareful observation of the finished food product will help determine optimal filtering frequ

Seite 14 - OPERATION

Gas Fryer Operation & Care Manual • 19OPERATIONFILTER REPLACEMENT1. WiththeDRAIN in the “CLOSED” position, pull the trolley from the fry

Seite 15

Gas Fryer Operation & Care Manual • 20OPERATIONFILTER CLEANING & MAINTENANCENOTE: Make certain to use hand protection when working wi

Seite 16

Gas Fryer Operation & Care Manual • 21OPERATIONCLEANING & MAINTENANCEOIL DISCARD HOSE OPTION:Theoildiscardhoseoption(HO-27686)is

Seite 17

Gas Fryer Operation & Care Manual • 22OPERATIONSUGGESTED FRYING TIMES i t e m m i n u t e s t e m p e r a t u r e d i s p l a y 1. F

Seite 18

Gas Fryer Operation & Care Manual • 23OPERATIONSUGGESTED FRYING TIMES ITEM MINUTES TEMPERATUREEggplant  4:00 340°F(171°C)EggRolls(fr

Seite 19 - CAUTION

Gas Fryer Operation & Care Manual • 24BASIC CONTROL OPERATIONCONTROL PANEL IDENTIFICATION 1. L.E.D. 4-DIGIT DISPLAY 6. RIGHT BASKET BUT

Seite 20

Gas Fryer Operation & Care Manual • 25BASIC CONTROL OPERATIONLEFT AND RIGHT BASKET OPERATIONNOTE: Because each fryer station is controlle

Seite 21

LEFT AND RIGHT BASKET OPERATION6. Press the LEFT BASKET or RIGHT BASKET button to stop alarm.7. REMOVE PRODUCTNOTE: To stop the cooking function o

Seite 22

SYNCHRONIZED BASKETS OPTIONNOTE: Because each fryer station is controlled separately, the following procedures must be followed for every component

Seite 23

Gas Fryer Operation & Care Manual • 1DELIVERY This Alto-Shaam appliance has been thoroughly tested and inspected to ensure only the highes

Seite 24

CONTROL PROGRAMMING OVERVIEWNOTE: Because each fryer station is controlled separately, the following procedures must be followed for every component

Seite 25

PROGRAMMING THE CONTROLNOTE: Because each fryer station is controlled separately, the following procedures must be followed for every component frye

Seite 26 - BASIC CONTROL OPERATION

PROGRAMMING THE CONTROL5. Choose the correct melt cycle for your frying compound. The melt cycle will appear in the LED as “C L” or “C S”. “C L”

Seite 27

TEMPERATURE VERIFICATIONNOTE: Because each fryer station is controlled separately, the following procedures must be followed for every component fry

Seite 28

Gas Fryer Operation & Care Manual • 32SERVICE1. FRYER WILL NOT POWER-UP A. Make certain cord is plugged in and breaker is turned “on.”

Seite 29

Gas Fryer Operation & Care Manual • 33SERVICEGas Fryer Operation & Care Manual • 33SERVICESERVICE DANGERDISCONNECT UNIT FROM PO

Seite 30

Gas Fryer Operation & Care Manual • 34ASF-75G SERVICEASF-75G SERVICEGas Fryer Operation & Care Manual • 34********V032RETLIFON,T

Seite 31

Gas Fryer Operation & Care Manual • 35ASF-75G SERVICEGas Fryer Operation & Care Manual • 35ASF-75G SERVICEALIATED817161914958271

Seite 32

423A1.A.S.U0540-25035IW,SLLAFEENOMONEMECNARELOTDRADNATSESIWREHTOSSELNUDEIFICEPS:YB:ELTIT:TCEJORP:GWD:ETADEZISTEEHSelosehtsigniwardsihtnideniatnocnoita

Seite 33 - TEMPERATURE VERIFICATION

Gas Fryer Operation & Care Manual • 37ASF-75G SERVICE411245916702890131118171351261523242622382729103224221334353A.A.S.U0540-25035IW,SLLAFE

Seite 34 - TROUBLESHOOTINGSERVICE

Gas Fryer Operation & Care Manual • 2INSTALLATIONCAUTIONUsed to indicate the presence of a hazard that can or will cause minor personal inj

Seite 35

ASF-75G SERVICEGas Fryer Operation & Care Manual • 38A77568843277.A.S.U0540-25035IW,SLLAFEENOMONEMECNARELOTDRADNATSESIWREHTOSSELNUDEIFICEPS

Seite 36 - GNIWARDD&R

Gas Fryer Operation & Care Manual • 39ASF-60G SERVICEGas Fryer Operation & Care Manual • 39ASF-60G SERVICEASF-60G SERVICE896745S

Seite 37 - ASF-75G SERVICE

Gas Fryer Operation & Care Manual • 40ASF-60G SERVICE5007518 LIFT ASSEMBLY-ASF-60ITEM PART NO DESCRIPTION QTY 1 5010972 GUIDECOLUM

Seite 38

Gas Fryer Operation & Care Manual • 41ASF-60G SERVICEGas Fryer Operation & Care Manual • 41ASF-60G SERVICE5008503 LOWER PANEL

Seite 39

3124METIREBMUNTRAP NOITPIRCSEDYTQ41632-UN S/S,XEH23-6,TUN4392972-EP TFILHTIWFSALRTCELPMIS-ENARBMEMHTIWYALREVO1299443-CCELPMIS-LORTNOC11 5657005 06-FSA

Seite 40

Gas Fryer Operation & Care Manual • 43ASF-75G SERVICEGas Fryer Operation & Care Manual • 43ASF-75G SERVICE

Seite 41 - ASF-60G SERVICE

Gas Fryer Operation & Care Manual • 44ASF-75G SERVICEASF-75G SERVICEGas Fryer Operation & Care Manual • 44

Seite 42

Gas Fryer Operation & Care Manual • 45ASF-60G SERVICE

Seite 43

Gas Fryer Operation & Care Manual • 46ASF-60G SERVICEASF-60G SERVICEGas Fryer Operation & Care Manual • 46

Seite 44

TRANSPORTATION DAMAGE and CLAIMSAll Alto-Shaam equipment is sold F.O.B. shipping point, and when accepted by the carrier, such shipments become the pr

Seite 45

Gas Fryer Operation & Care Manual • 3INSTALLATION38-11/16" (983mm)OILTROLLEY50-3/16" (1274mm) LIFT UP44-13/16" (1138mm) LIFT

Seite 46

ASF-60G SPECIFICATIONS33-5/8" (853 mm)23-3/8"(592mm)47-1/2" (1206mm)6-5/8"(168mm)5-9/16"(141mm) Electric Connection31-9/16&qu

Seite 47

NOTE: To avoid equipment damage, remove the Mobile Oil Trolley before moving this appliance with a forklift or pallet lift.MINIMUM CLEARANCE REQUIRE

Seite 48

1. It is the responsibility of the installer to verify that this fryer installation is in compliance with the specifications listed in this manual an

Seite 49 - LIMITED WARRANTY

1. AsingleASF-75GorASF-60Gauto-liftgasfryerrequires a minimum of 120 CFM make-up air for naturalgasand48CFMforpropanegas.Kitchenve

Kommentare zu diesen Handbüchern

Keine Kommentare